Residence Permit Renewal Service

Renewing a Georgian residence permit means filing a fresh application at least 40 calendar days before your current lawful stay expires, with your evidence refreshed. On work and IT routes you now renew the Special Labour Permit first. Here is the sequence, the documents and what to do if the deadline is already close.

  • Anyone holding a Georgian residence permit
  • People whose permit expires within six months
  • Residents caught by the 2026 labour permit rules
  • Anyone who has already missed a deadline
File at least
40 days early
Our fee from
$230
Decision in
10–30 days

What this unlocks

  • We hold the 40-day date

    File later than that and the Agency will not review it, however strong your case. This is the failure we exist to prevent.

  • Both expiry dates tracked

    Since March 2026 a work permit has two, from two agencies that do not coordinate. Missing either one costs you the other.

  • Continuity protected

    A gap between permits resets your count toward permanent residence, and stays invisible until you apply for it.

  • Evidence refreshed, not recycled

    Income, address, turnover and insurance that passed last year frequently do not this year. We check before filing.

The 40-day rule

You must apply at least 40 calendar days before your current lawful stay expires. Not before you want the new permit to begin: before the existing one runs out. Applications filed inside that window are refused review, and the refusal is procedural rather than substantive, so the strength of your case is irrelevant to it. Where the deadline is missed but the card is still valid, the Agency may accept an application with a good reason. That is discretion, not a right, and it is not a plan.

What changed at renewal in 2026

Renewal used to be a lighter version of the original application. For anyone on a work or IT permit it is no longer, because since 1 March 2026 the Special Labour Permit sits underneath the residence permit and has to be valid too. That means two expiry dates to track instead of one, from two different agencies that do not coordinate with each other. If you have held a work permit since before March 2026 and have never obtained a labour permit, the renewal is the moment that gap becomes visible, so it is worth starting earlier than you would have done.

What we do

We hold the dates, start the file early enough that a slow document from your home country does not become a crisis, refresh whatever evidence has gone stale, and file. On the work routes that means the labour permit renewal is sequenced ahead of the residence permit renewal rather than discovered afterwards.

  • Both expiry dates tracked: residence permit and labour permit
  • Renewal started early enough to absorb a slow apostille
  • Income, address, insurance and turnover evidence refreshed
  • Labour permit renewal sequenced first on work and IT routes
  • Submission with accompaniment, and the new card collected

If you have already missed the window

Do not wait to see what happens. If your card is still valid there may be room to file with an explanation. If your stay has already lapsed, the position is different and the options are narrower, but they exist, and the worst version of this is the one where somebody spends three weeks hoping before asking. Tell us the dates and we will tell you honestly which situation you are in.

Want us to handle your renewal and extension?

Thirty free minutes. We will confirm whether this route fits before you spend anything.

Get started

Pricing

Fees
Property permit renewal

Per year. Documentation and submission while you hold the property.

$230
Work or IT permit renewal

Higher because the evidence has to be rebuilt each cycle and the labour permit renewal runs alongside it.

from $345
Labour permit renewal

Required first on work and IT routes.

from $305
Family member renewal

Per dependent, renewed with the principal applicant.

from $190
Expedited processing
$115

Prices exclude 18% VAT where applicable. Fees are quoted in USD and settled in Georgian lari at the prevailing rate. Government fees are separate: $115–230 depending on the track.

How renewal runs

  1. 01

    Diary check

    10 minutes

    We work backward from your expiry date and tell you the last safe filing date. If it is close, we say so immediately rather than starting a process that will not finish in time.

  2. 02

    Evidence refresh

    1–2 weeks

    Income, turnover, address, insurance: whatever your route requires, updated. Documents that were fine last year are frequently not this year.

  3. 03

    Labour permit first

    Up to 30 days

    On work and IT routes, the labour permit renewal is sequenced ahead of the residence permit. Getting this order wrong is the new way to fail a renewal.

  4. 04

    File, at least 40 days out

    Same day

    Submitted with accompaniment, inside the deadline, with a tracking reference.

  5. 05

    Decision and new card

    10–30 days

    Then the next renewal goes in the diary before you leave.

Frequently asked questions

At least 40 calendar days before your current lawful stay expires. The Agency refuses to review applications filed inside that window, regardless of the merits.

No obligation

Not sure this is the right one?

Thirty free minutes, no obligation. We will tell you which route actually fits, including when the answer is that you do not need us.